Planning Documents
|
|
Document 01
|
Covering letter
|
Document 02
|
Application form
|
Document 03
|
Public Notice
|
Document 04
|
Hunterston Converter Station & Substation: Outline Design
Framework (October 2011)
|
Document 05
|
Non Technical Summary: Hunterson Converter Station & Substation
(October 2011)
|
Document 06
|
Environmental Report: Hunterston Converter Station & Substation
(October 2011)
|
Document 07
|
Design Statement: Hunterston Converter Station & Substation
(October 2011)
|
Document 08
|
Pre-Application Consultation Report: Hunterston Converter Station &
Substation (October 2011)
|
Document 09
|
Environmental Appraisal Supporting Report: Hunterston - Ardneil Bay
Underground Cable Route (October 2011)
|
Document 10
|
Planning Supporting Statement: Hunterston Converter Station &
Substation (October 2011)
|
Condition statements and mitigation
|
|
Document 11
|
Condition statement 01
|
Document 12
|
Condition statement 02
|
Document 13
|
Condition statement 03
|
Document 14
|
Condition statement04
|
Document 15
|
Condition statement 05
|
Document 16
|
Condition statement 06
|
Document 17
|
Condition statement 07
|
Document 18
|
Condition statement 08
|
Document 19
|
Condition statement 09
|
Document 20
|
Condition statement 10
|
Document 21
|
Condition statement 11
|
Document 22
|
Condition statement 12
|
Document 23
|
Condition statement 13
|
Document 24
|
Confirmation of satisfaction of condition 6
|
Document 25
|
Design mitigation
|
Document 26
|
Traffic site management plan
|
Document 27
|
Traffic site management plan - Portencross road compound
|
Environmental reports and surveys
|
|
Document 28
|
Area of otter survey
|
Document 29
|
Barn owl survey report
|
Document 30
|
Barn owl vantage point locations
|
Document 31
|
Bat activity transect survey
|
Document 32
|
Bat transect survey route
|
Document 33
|
Bat survey report
|
Document 34
|
Bat commuting route survey
|
Document 35
|
Dusk and dawn bat surveys
|
Document 36
|
Identified bat roosts
|
Document 37
|
Nesting bird risk assessment
|
Document 38
|
Ecological clerk of works specification and mitigation plan
|
Document 39
|
Proposed habitat enhancement measures
|
Document 40
|
Factual report of ground investigation
|
Document 41
|
Environmental soil tests
|
Document 42
|
Borehole and trial pit locations
|
Document 43
|
Landscape master plan
|
Document 44
|
Planting and seeding overview
|
Document 45
|
Planting and seeding detail
|
Document 46
|
Converter station phase 2 geo-environmental investigation
|
Document 47
|
Substation phase 2 geo-environmental investigation
|
Document 48
|
High resolution gamma ray spectroscopy results
|
Plans
|
|
Document 49
|
Site map
|
Document 50
|
Combined programme converter station and substation
|
Document 51
|
Location plan
|
Document 52
|
Planning layout
|
Document 53
|
Site layout
|
Document 54
|
Site sections
|
Document 55
|
Proposed floor plan filter hall 1 (south)
|
Document 56
|
Proposed floor plan filter hall 2 (north)
|
Document 57
|
Proposed floor plan plc buildings
|
Document 58
|
Proposed floor plan spare parts building
|
Document 59
|
Proposed floor plan svc/converter building
|
Document 60
|
Proposed floor plan valve hall and control building
|
Document 61
|
Proposed elevations
|
Document 62
|
Proposed elevations filter hall 1 (south)
|
Document 63
|
Proposed elevations filter hall 2 (north)
|
Document 64
|
Proposed elevations plc buildings
|
Document 65
|
Proposed elevations spare parts building
|
Document 66
|
Proposed elevations svc/converter building
|
Document 67
|
Proposed elevations valve hall and control building
|
Document 68
|
Proposed floor plan g.i.s substation
|
Document 69
|
Proposed elevations g.i.s substation
|
Document 70
|
Proposed planning elevations g.i.s. substation
|
Document 71
|
Proposed planning layout g.i.s substation
|
Document 72
|
Cdm hazard zone layout 1
|
Document 73
|
Cdm hazard zone layout 2
|
Document 74
|
Cdm hazard zone layout 3
|
Document 75
|
Drainage strategy statement
|
Document 76
|
Proposed surface water drainage statement
|
Document 77
|
Drainage details
|
Document 78
|
Drainage outfall route
|
Document 79
|
Combined converter station and substation drainage
|
Document 80
|
Schematic drainage layout
|
Document 81
|
Substation drainage layout
|
Document 82
|
Cross sections
|
Document 83
|
Cross section A
|
Document 84
|
Cross sections B
|
Document 85
|
Haul road red line boundary
|
Document 86
|
Provisional inland transport assessment - movement of transformers
|
Document 87
|
Emergency Response Plan
|
General
|
|
Document 88
|
Autumn Newsletter 2013
|
Document 89
|
Public event display boards 2013
|
Document 90
|
Revised viewpoints 1 (March 2013)
|
Document 91
|
Revised viewpoints 2 (March 2013)
|
Community Liaison Group Minutes
|
|
Document 92
|
27.11.2013
|
Document 93
|
25.02.2014
|
Document 94
|
20.05.2014
|
Document 95
|
26.08.2014
|
Document 96
|
25.11.2014
|